Μετάβαση στο περιεχόμενο
Τελευταία ενημέρωση: 29 Σεπτεμβρίου 2026 TodayGrid
Creta Today
60″ Briefing Αναζήτηση
60″
60″
Ηράκλειο—°Σήμερα στην περιοχή →

Venizeleio Hospital: ceiling collapse sparks clash with Health Minister

A portion of ceiling collapsed on August 10 in a physician office at Venizeleio Hospital in Heraklion. The incident triggered a confrontation between the Health Ministry and hospital workers.

English Machine-translated from Greek · Read the Greek original

Greek local news in your inbox, every morning.Subscribe free →

A portion of the ceiling in a physician office at Venizeleio Hospital in Heraklion collapsed on August 10, with plaster falling in a space where medical staff work daily. The incident caused no injuries but triggered a confrontation between the political leadership of the Health Ministry and hospital workers, with the focus on the condition of healthcare facility infrastructure in Heraklion.

The Venizeleio building has been in operation for 73 years, according to the hospital’s union, and as that organization notes, there are mature renovation studies that have not been implemented. Union president Dimitris Flytzanis, speaking to Cretalive, found the minister’s statements to be wholly inappropriate and called for priority to be given to restoring the hospital’s facilities.

Health Minister Adonis Georgiadis responded to reports with the phrase «Relax people, the NHS is not collapsing,» attributing the criticism to those cultivating misery. On Tuesday, August 11, he returned to the matter, calling the incident basically insignificant and stating that he has already ordered a renovation study for the hospital, but without announcing a budget or specific implementation timeline.

In the same statement, the minister linked the planned renovation to the horizon of national elections in 2027, placing the project in political rather than technical time. Deputy Vatsina also intervened in the discussion, calling for an on-site visit to Crete so that the hospital’s condition could be assessed in place rather than through announcements and statements exchanged remotely.

For staff and patients, the issue does not end at the square footage of an office. The age of the building means that any maintenance work must be performed in a hospital operating continuously, with clinics and labs at full capacity during the summer months when the island’s population increases due to tourism. Workers raise the question of what would have happened in a comparable incident within a patient care space.

The two sides place different emphasis on the same event. The ministry’s reading places it in the domain of maintaining an old building, while the union side sees it as evidence of chronic underfunding of healthcare infrastructure. Neither side has released a technical report on the state of the ceiling, nor has it been disclosed whether the space remains out of use until repairs are made.

The next step is the renovation study referenced by the minister, with no word yet on which entity will conduct it or when it will be delivered. The union is seeking a specific timeline and guaranteed funding, while the request for an on-site visit remains open. Until then, the question of how many other locations in the building need inspection remains unanswered for both patients and staff.

Πηγές

Πρωτογενείς πηγές

Μέσα ενημέρωσης